Arlington Water Supply Improvements

Project Description

Schwab Eaton assisted the City of Arlington with the planning and design of water supply improvements for their community. The project consisted of two new potable water supply wells with variable frequency drives (VFDs), one chlorination building, approximately 5,200 LF of 8-inch PVC transmission line, various road and stream crossings, telemetry system upgrades, and miscellaneous distribution system improvements. This project was made possible with financing from a KDHE State Revolving Loan Fund.