Concrete Boat Ramp & Asphalt Parking Lot Improvements
The project consisted of both concrete boat ramp and asphalt parking lot improvements.
6th Street Reconstruction
Schwab Eaton provided field surveys, design, plan preparation and specifications for this 30 foot roadway, water line and storm water improvement project.
Milford Splash Park
The overall project required road re-alignments, parking lot redesign, extensive site grading, a winterized pump house building, an ADA Shower and Restroom Building, a new sewer lift station and force main, and re-routing and/or burying of utilities.
KDOT Project 1 C-0388-01
Schwab Eaton performed a preliminary study for replacing the bridge in a cost effective manner that would reduce traffic accidents occurring at the location.