Schwab Eaton provided field surveys, design, plan preparation and specifications for this 30 foot roadway, water line and storm water improvement project.
Read MorePhase 3A and 3B extended the new four-lane section southward to Claflin Road.
Read MoreWith recent expansion of the KSU Research Park and the construction of the new Department of Agriculture building, the City of Manhattan realized that the existing two-lane, open ditch section needed improvement.
Read MoreCompleted in 2019, this project will increase the safety, driveability, and pedestrian connectivity of the Kimball Avenue corridor.
Read MoreKSU Facilities and Schwab Eaton worked to determine a cost-effective, durable and lasting pavement section.
Read MoreSchwab Eaton performed a preliminary study for replacing the bridge in a cost effective manner that would reduce traffic accidents occurring at the location.
Read More