KDOT Project 1 C-0388-01
Schwab Eaton performed a preliminary study for replacing the bridge in a cost effective manner that would reduce traffic accidents occurring at the location.
Whispering Meadows is anticipated to be complete by 2028.
Schwab Eaton performed a preliminary study for replacing the bridge in a cost effective manner that would reduce traffic accidents occurring at the location.