6th Street Reconstruction
Schwab Eaton provided field surveys, design, plan preparation and specifications for this 30 foot roadway, water line and storm water improvement project.
North Manhattan Avenue, Phase 3 A & B
Phase 3A and 3B extended the new four-lane section southward to Claflin Road.
North Manhattan Avenue, Phase 1 & 2
With recent expansion of the KSU Research Park and the construction of the new Department of Agriculture building, the City of Manhattan realized that the existing two-lane, open ditch section needed improvement.
Kimball Avenue Widening, Vanesta Drive to Hudson Avenue
Completed in 2019, this project will increase the safety, driveability, and pedestrian connectivity of the Kimball Avenue corridor.
KSU Rathbone Hall Parking Lot A28 Reconstruction
KSU Facilities and Schwab Eaton worked to determine a cost-effective, durable and lasting pavement section.
KDOT Project 1 C-0388-01
Schwab Eaton performed a preliminary study for replacing the bridge in a cost effective manner that would reduce traffic accidents occurring at the location.