The project consisted of both concrete boat ramp and asphalt parking lot improvements.
Read MoreSchwab Eaton provided field surveys, design, plan preparation and specifications for this 30 foot roadway, water line and storm water improvement project.
Read MoreThis project consists of adding sewer utilities and concrete parking pads, as well as upgrading existing electrical and water services, for 40 additional campsites.
Read MoreWorking in concert with KDWPT staff, the master plan included a new river pump station, discharge line with direct discharge to the managed pools, centralized parking lot with boat ramps, boating canals, and additional levees to improve wetland management and public use.
Read MoreThe overall project required road re-alignments, parking lot redesign, extensive site grading, a winterized pump house building, an ADA Shower and Restroom Building, a new sewer lift station and force main, and re-routing and/or burying of utilities.
Read MorePhase 3A and 3B extended the new four-lane section southward to Claflin Road.
Read MoreWith recent expansion of the KSU Research Park and the construction of the new Department of Agriculture building, the City of Manhattan realized that the existing two-lane, open ditch section needed improvement.
Read MoreWhispering Meadows is anticipated to be complete by 2028.
Read MoreKSU Facilities and Schwab Eaton worked to determine a cost-effective, durable and lasting pavement section.
Read MoreVictor E. Village is one major component of a significant ($30M +) student housing project involving multiple contractors, and a complex set of construction sequencing activities ultimately replacing FHSU's Wiest Hall.
Read MoreThis project provided a new home for the College of Business on the Manhattan campus of Kansas State University.
Read More